Wind Project — Phase II Approvals
This page outlines the Phase II regulatory approvals required to progress the Tulcea Wind Project from advanced development into a fully construction-ready asset. Phase II approvals build upon the foundations established during Phase I and focus on detailed technical and execution readiness.

Phase II Approval Scope
Phase II approvals cover detailed engineering, grid execution, and construction-specific permits. These approvals confirm that the project is technically executable and compliant with all relevant regulatory requirements.
Key Phase II Approvals
- Final Grid Connection Agreement
- Detailed Electrical Design Approval
- Construction Permit
- Aviation & Radar Clearances
- Environmental Compliance Confirmation
- Health & Safety Approvals
Path to Ready-to-Build (RTB)
Completion of Phase II approvals positions the project as Ready-to-Build, enabling immediate transition into procurement and construction activities. Achieving RTB status significantly reduces development risk and enhances project bankability.
Turbine procurement, construction scheduling, and commissioning activities are addressed within subsequent project phases.


Turning Sunlight into Reliable Clean Power
Aurora Renewables SRL Wind projects harness consistent wind resources using advanced turbine technology to deliver dependable, low-carbon electricity. Engineered for performance and grid stability, our wind solutions support energy resilience across diverse operating conditions.
Key Features
Built with high-efficiency turbines, intelligent control systems, and grid-integrated infrastructure, Aurora Renewables SRL Wind projects provide stable power generation, reduced variability, and long-term operational reliability while minimising environmental impact.
Wind Project Documentation
Explore the complete details in our interactive presentation below.